info@bisrbd.com
Hasina De Palace, Appt. # 6/B, House # 6/14, Block # A, Lalmatia
info@bisrbd.com
Hasina De Palace, Appt. # 6/B, House # 6/14, Block # A, Lalmatia, Dhaka-1207, Bangladesh

Projects Details

Home / Projects / Feasibility study with detailed design for constru...
Client
Oriental Consultants Global Co, Ltd (Japan), EGIS Rail (France) and KHSS Integrated Sdn. Bhd. (Malaysia)
Services
Resettlement Works
Date
June 2024 to December 2025
Feasibility study with detailed design for construction of DG/BG line par allel to the existing MG line and conversion of existing MG line into DG/BG line in Bhairab Bazar-Mymensingh section (SP-5)
Feasibility study with detailed design for construction of DG/BG line par allel to the existing MG line and conversion of existing MG line into DG/BG line in Bhairab Bazar-Mymensingh section (SP-5)